You are here :
Home National Status of Common Effluent Treatment Plants (CETPs)
|
Last Updated:: 05/01/2021
National Status of Common Effluent Treatment Plants (CETPs)
CETP Analysis Report (From April - 2019)
Updated on 24th Dec, 2020
Status of CETPs in Ganga Main stem as on February, 2019
S. N.
|
Name of CETP
|
*Member unit connected
|
Type of Industries
|
Designed capacity /day in MLD
|
Operational Status
|
Compliance status
|
1
|
CETP Jajmau, Kanpur.
|
357
|
Tanneries effluent combined with sewage
|
36.0
|
Operational
|
Non complying
|
2
|
Leather Technology Park, Banthar, Unnao
|
42
|
Tanneries
|
4.15
|
Operational
|
Non complying
|
3
|
UPSIDC, Site-II, Unnao
|
21
|
Tanneries
|
2.15
|
Operational
|
Non complying
|
4
|
CETP Sitarganj, Uttarakhand
|
97
|
Mixed
|
4.0
|
Operational
|
Non complying
|
5
|
IIE SIDCUL CETP, Pant Nagar, Uttarakhand
|
310
|
Mixed
|
4.0
|
Operational
|
Complying
|
6
|
Rooma Industrial Area, Kanpur
|
12
|
Textile
|
1.55
|
Operational
|
Non complying
|
7
|
Textile Center, Pilkhuwa (UP)
|
11
|
Textile
|
2.10
|
Operational
|
Non complying
|
*Operational numbers may vary.
Source:CPCB Central Pollution Control Board Annual Report 2018-19 Updated on 28th August, 2020
Status of CETPs in Ganga Main stem
S.
no.
|
name of Cetp
|
Member unit connected (operational- number varies)
|
type of Industries
|
Designed capacity
/day in MlD
|
operational Status
|
Date of last
Inspection
|
Compliance status
|
1
|
CeTP Jajmau, Kanpur, U.P.
|
400
|
Tanneries
|
36.0
|
operational
|
15.02.2018
|
non- complying
|
2
|
leather Technology Park, Banthar, Unnao, U.P.
|
42
|
Tanneries
|
4.15
|
operational
|
08.08.2017
|
non- complying
|
3
|
UPsiDC, site-ii, Unnao, U.P.
|
21
|
Tanneries
|
2.15
|
operational
|
15.02.2018
|
non- complying
|
4
|
UeM- siDCUl CeTP, haridwar Uttarakhand
|
424
|
heterogeneous (mixed )
|
4.5
|
operational
|
23.03.2018
|
non- complying
|
5
|
CeTP sitarganj, Uttarakhand
|
96
|
heterogeneous
|
4.0
|
operational
|
27.11.2017
|
non- complying
|
6
|
iie siDCUl CeTP, Pant nagar, Uttarakhand
|
310
|
(mixed )
|
4.0
|
operational
|
27.11.2017
|
Complying
|
7
|
Rooma industrial Area, Kanpur, U.P.
|
12
|
Textile
|
1.55
|
non- operational
|
01.11.2017
|
Under stabilization process
|
8
|
Textile Center, Pilkhuwa, U.P.
|
info. not Available
|
Textile
|
2.10
|
-
|
-
|
-
|
Total number of inspections are 16.
|
Source: CPCB Annual Report 2017-18 Updated on 10th August, 2020